Home
Doors
Specs
Tech
Contact Us
Measurements in
Imperial    Metric

 
 

Related Sites

Noise Control
Anechoic Chambers
Sound Level Meters
Audiology Rooms
Noise At Work
School Acoustics

 

Door Installation Step 1

Doorway Preparation

 

  1. Inspect. If carton or doors are damaged from shipping (bent shaft, etc.) contact the factory
  2. Check jamb and header for plumb, level and square (measure diagonals).
  3. Match size of door opening to size on packing slip.
  4. Mark center plumb line on jamb.
  5. Remove the top mounting angle from door by removing the hardware housing from the top corner of each side
  6. Line up the center line on the bottom of the mounting angle with the jamb centerline. Use the angle as a template to mark the hole locations on the jamb and header and center-punch the holes.
  7. Use the jamb guard as a template for the bottom mounting holes, lining up the centerline of the jamb guard with the centerline of the jamb. Mark the hole locations on jamb and floor and center-punch the holes.
  8. Drill centers with #7 bit (for steel channel), tap 1/4-20 and fasten to jamb with 1/4-20 bolts.
  9. If jambs are wood or hollow metal over wood, fasten using 1 1/2" wood lags. Hollow metal frames without wood rough blocks should have 1/4" steel reinforcements (b/o) at jamb and header locations.

Next Step 2

 

 
[ Home ] [ V-cam Install ] [ EZ-Hang Install ]
   
Half Moon Street
Bagshot
Surrey GU19 5AL

Email: info@rubbair.co.uk